Return to the CurtPalme.com main site CurtPalme.com Home Theater Forum
A forum with a sense of fun and community for Home Theater enthusiasts!
Products for Sale ] [ FAQ: Hooking it all up ] [ CRT Primer/FAQ ] [ Best/Worst CRT Projectors List ] [ Setup Tips & Manuals ] [ Advanced Procedures ] [ Newsletter ]
 
Blu-ray disc release list and must-have titles. Buy the latest and best Blu-ray titles to show off in your home theater!

 As this forum is rarely used anymore, we've locked it. Feel free to browse and read. Questions? Please reach out to us directly. Cheers! 

So I think I built my walls incorrectly

 
This forum is locked: you cannot post, reply to, or edit topics.   This topic is locked: you cannot edit posts or make replies.    CurtPalme.com Forum Index -> Home Theater Design & Construction
Author Message
stgdz



Joined: 07 Dec 2008
Posts: 107


Posted: Sun Dec 28, 2008 6:04 pm    Post subject: So I think I built my walls incorrectly

I saw on a construction site that a guy built his studs 8in apart in a staggered configuration and he commented that the sound level from room to room was reduced with double dry wall. What I failed to realize is that the staggered configuration was a top and bottom cap using a 2x6, I used a 2x4 for the top and bottom caps.

So with the little research that I have been doing since the walls have went up, and they aren't going to come down since they are bolted to the floor, what can I do for more sound proofing besides dual sheat rock with green glue in between?


Last edited by stgdz on Sun Dec 28, 2008 10:29 pm; edited 1 time in total
Back to top
ecrabb
Forum Moderator


Joined: 13 Mar 2006
Posts: 15909
Location: Utah

TV/Projector: JVC RS40, Epson 5010

Posted: Sun Dec 28, 2008 6:22 pm    Post subject:

Have you rocked, yet? If not, you could take out every other stud, add a 2x2 on the header and footer, and re-install the studs. If you didn't want to demo, you could also add a layer if Integrity Gasket to all the framing, but only fasten to every other stud.

If the walls are already assembled and you don't want to do any demolition, then Green Glue and a second layer of gyp is really your best bet and is pretty much the only option. It's not a bad option, though.

My room is done with standard framing (didn't have the money, time, patience, or space for RSIC/hat channel), Integrity Gasket, and double drywall w/Green Glue - 1/2"+1/2" on the walls and 1/2"+5/8" on the ceiling. I'm pretty impressed with the whole thing considering the minimal cost (relatively speaking).

The cost of the isolation I did was probably around $600 - $125 for Integrity Gasket, $250 for Green Glue, $200 for extra drywall and screws, and another weekend of hanging drywall - which SUCKED. The only thing that doesn't sound pretty darn good in my room (AFA isolation) is that I have hardwood in the living room directly above the theater, and footfalls and especially hard/high frequence impact like kids toys come through pretty well because of the lack of mechanical decoupling. I think my room was the next best thing to true room-within-a-room, which would have been much more costly, time-consuming, and used more of my space which was already at a premium.

SC
Back to top
View user's photo album (10 photos)
stgdz



Joined: 07 Dec 2008
Posts: 107


Posted: Mon Jan 05, 2009 2:25 pm    Post subject:

ecrabb wrote:
Have you rocked, yet? If not, you could take out every other stud, add a 2x2 on the header and footer, and re-install the studs. If you didn't want to demo, you could also add a layer if Integrity Gasket to all the framing, but only fasten to every other stud.
SC
No I haven't rock'd yet but I don't know if I want to take out every other stud(I don't feel like doing demolition to it though as it just looks nice).

I have been looking at a material called DB block and possibly running RISC clips.
http://www.controlnoise.com/dbbloc.html
Back to top
Clarence



Joined: 08 Mar 2006
Posts: 3827
Location: Smith Mtn Lake, VA

Posted: Mon Jan 05, 2009 2:49 pm    Post subject:

ecrabb wrote:
If you didn't want to demo, you could also add a layer if Integrity Gasket to all the framing, but only fasten to every other stud.

That's the best idea... you don't need a 2" gap, the separation layer of Integrity Gasket would be sufficient (~1/8").
Back to top
This forum is locked: you cannot post, reply to, or edit topics.   This topic is locked: you cannot edit posts or make replies.    CurtPalme.com Forum Index -> Home Theater Design & Construction All times are GMT
Page 1 of 1
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum
You cannot attach files in this forum
You can download files in this forum